• The GPS: Govt Pro-roads Statement on transport

    The GPS: Govt Pro-roads Statement on transport0

    • 27 March 2017

    If you’ve ever wondered why it is that cycling only seems to get a pittance of the funding that roading does, it’s largely down to an innocuously named document called the GPS. No, it’s not about determining your location by satellite, the “Government Policy Statement on Land Transport” sets the plan for transport spending by

    READ MORE
  • Ferry Road a link or a gauntlet for the Heathcote Expressway?

    Ferry Road a link or a gauntlet for the Heathcote Expressway?0

    • 26 March 2017

    This project was already consulted on in late 2016. While a real improvement, it fell short of CCC’s own Cycle Design Guidelines for a Major Cycle Route. Submissions received provided strong support along with requests to improve what was on offer. Business owners on the Ferry Road section complained that they would lose much needed

    READ MORE
  • Nor’West Arc Cycleway now due for consultation

    Nor’West Arc Cycleway now due for consultation0

    • 24 March 2017

    Simon Barnard has already introduced you to the latest Major Cycleway project out for consultation and aired his concerns. Here’s a bit more of a breakdown of what is proposed, to help you make a submission (which are due next Monday 27th). The Nor’West Arc cycleway will eventually swing all the way from Papanui through

    READ MORE
  • CCC’s Nor’Worst Arc

    CCC’s Nor’Worst Arc0

    • 16 March 2017

    OK, a bit harsh but, please read on. CCC continues to roll out the Major Cycle Routes, MCR’s, for consultation. The most recent is the Nor’West Arc which goes from the University down to Cashmere Road near Princess Margaret Hospital. This link will take you to CCC’s Have Your Say and the details. The issues

    READ MORE
  • All aboard the Heathcote Expressway consultation

    All aboard the Heathcote Expressway consultation1

    • 20 December 2016

    It’s been a busy couple of months in terms of Major Cycleway consultations. So far we’ve seen three planned routes rolled out for public feedback, and there’s one more to squeeze in before Christmas – the Heathcote Expressway. Originally, submissions on this were due to close last week, but that date has now been extended

    READ MORE
  • Guest Post: One Ride, Two Cycleways, Many Options

    Guest Post: One Ride, Two Cycleways, Many Options4

    • 13 December 2016

    Guest blogger Robert contemplates a Sunday well spent… It was billed as a Spokes Submission ride on Sunday Dec 11th to check out details for the currently consulted Heathcote Expressway and Rapanui-Shag Rock (Stage 2-3) Cycleways (described as a leisurely two hour ride out to the Heathcote and return). It evolved into a four-hour masterclass

    READ MORE
  • Rapanui / Shag Rock cycleway consultation continues

    Rapanui / Shag Rock cycleway consultation continues1

    • 7 December 2016

    The consultation season continues with another Major Cycleway out for consideration. While work is underway to start constructing Stage 1 of the Rapanui / Shag-Rock cycleway, plans for Stages 2 & 3 are now publicly available. This takes the cycleway from its current terminus at Linwood Park out through Woolston and Charlesworth to join the

    READ MORE
  • Northern Line Cycleway consultation

    Northern Line Cycleway consultation1

    • 10 November 2016

    Hot on the heels of the Quarryman’s Trail cycleway consultation, another Major Cycle Route is also currently seeking public feedback. The Northern Line cycleway will take the existing much-loved Railway Cycleway and extend it further north and south, all the way from Addington to Northwood. Essentially there are three main bits to this consultation: An

    READ MORE
  • Waimakariri District Walking/Cycling Strategy

    Waimakariri District Walking/Cycling Strategy8

    • 4 November 2016

    Immediately north of Christchurch, our nearest neighbours Waimakariri District are also getting into the cycling swing of things. While many people have been focused on the many cycleways happening across Christchurch, the Govt’s Urban Cycleways Programme is also delivering some cycle facilities north of the Waimakariri River as well. With that in mind, the District

    READ MORE
  • Quarryman’s Trail consultation out now

    Quarryman’s Trail consultation out now4

    • 25 October 2016

    As we mentioned a couple of weeks ago, there are now a number of cycleway projects under construction or out for consultation. One of those in the latter group is the Quarryman’s Trail, stretching from central city all the way out to Halswell. You can now have the chance to have your say on the

    READ MORE
  • Lots of Major Cycleway action underway

    Lots of Major Cycleway action underway0

    • 13 October 2016

    Spring is upon us and it seems also the Major Cycleway action season. Almost all at once, there is a flurry of both consultation and construction activity starting up on a number of cycleway routes across the city. The Christchurch City Council has lots of details on their website now about the different routes, and

    READ MORE
  • Have your say on allowing Footpath Cycling

    Have your say on allowing Footpath Cycling7

    • 2 October 2016

    You might recall earlier this year that Lower Hutt mother Jo Clendon was petitioning Government to make it legal for kids to ride their bikes on the footpath. As mentioned previously, currently it is illegal for anyone to ride on an ordinary footpath, unless they have a small child’s bike or are delivering material. Jo’s

    READ MORE

WE’RE LOOKING FOR CONTRIBUTORS!

Featured Post

Newsletter Signup

Latest Comments

Bikes and Equipment

MORE FROM Bikes & Equipment